Tuesday, July 5, 2011

Base All Welded

After walking the dogs this morning, I went into the shop and welded up all connections and then used the 4-1/2" grinder to smooth them off.
 
Welded and ground smooth (well, sorta)

 
I leaned it up against the door so you can see the cargo box bottom attached to the pivot unit.

 
A closer view of the pivot unit - you can see the chainring and plate welded together and two 1/4" bolts attaching the cargobox bottom to the pivot unit.

 
Here it is, back clamped in the vise.

 
A side view across the cargobox bottom.
Next up are those outside pieces to hold the wheels ...
and then the vertical corners. 

No comments:

Post a Comment