The drill thing is what I used to drill the hole for the head tube.
White u-strip will be welded on for the idler wheels
to get the chain up and out of the way of the front fork.
I'm working on 2 different cargo bikes right now ... and showing some of the other Recumbents that I've made.
At this point I finally put a chain on the Mach2. There's also a skate-wheel idler roller (red) to keep the return chain from flopping. I finally rode it for the first time. I like the way it handles.
2 x 4's aren't necessarily 8 ft. long anymore ... so the foundation of the jig ended up being about 46" long. That was on the left side ... where the overlap won't matter all that much. The holes drilled in the plywood are used to insert clamps to hold the main tube firmly in place for little operations such as drilling or welding. There's one 2 x 4 block on top ... I need 8 of them. More about this later ...